Investor ABB
Project Name Factory Electrical Infrastructure
Location Istanbul / Turkey
Contract Start Date 2015
Work End Date 2015
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Energy Distribution (Transformer Center)
      • Low Voltage Energy Distribution
      • Cable Ducts and Cables
      • Compensation Panels
      • Low Voltage Distribution Panels
      • Testing and Commissioning
Within the scope of the Factory Electrical Infrastructure project completed in 2015 at ABB’s production facility in Istanbul, a safe and efficient energy infrastructure supporting production processes was established. 
Within the scope of the project, medium and low voltage energy systems, transformer center, distribution panels, energy cabling lines and infrastructure elements were installed. All systems were commissioned in accordance with ABB’s high engineering standards. This project provided operational continuity for the factory and created a solid foundation for long-term energy management.