Investor Acibadem Hospital Maslak
Project Name Transformation Center Installation
Location Istanbul / Turkey
Contract Start Date 2017
Work End Date 2017
Project Status Done

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
Acıbadem Hospital Maslak completed in 2017 with the Transformer Center Installation project, the hospital's energy infrastructure was strengthened, uninterrupted and safe energy was provided.
Within the scope of the project, a 34.5/0.4 kV transformer center was built, medium voltage cells, distribution boards and cabling works were completed. The system is specially designed for the security and continuity of the hospital's operations.
New Projects