Investor | Acibadem Hospital Maslak |
---|---|
Project Name | Transformation Center Installation |
Location | Istanbul / Turkey |
Contract Start Date | 2017 |
Work End Date | 2017 |
Project Status | Done |
Acıbadem Hospital Maslak completed in 2017 with the Transformer Center Installation project, the hospital's energy infrastructure was strengthened, uninterrupted and safe energy was provided.
Within the scope of the project, a 34.5/0.4 kV transformer center was built, medium voltage cells, distribution boards and cabling works were completed. The system is specially designed for the security and continuity of the hospital's operations.