Investor Acıbadem Hospitals
Project Name Transformer Center Installation
Location Istanbul / Turkey
Contract Start Date 2014
Work End Date 2014
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
With the Transformer Center Installation project completed in 2014 at Acıbadem Hospitals’ Istanbul facility, the hospital’s energy infrastructure was strengthened and uninterrupted and safe energy was provided.
The project included the installation of a 34.5/0.4 kV transformer center, medium voltage cells, distribution panels and cabling works. The system was designed for the safety and continuity of the hospital’s operations.