Investor | Acıbadem Hospitals |
---|---|
Project Name | Transformer Center Installation |
Location | Istanbul / Turkey |
Contract Start Date | 2014 |
Work End Date | 2014 |
Project Status | Completed |
With the Transformer Center Installation project completed in 2014 at Acıbadem Hospitals’ Istanbul facility, the hospital’s energy infrastructure was strengthened and uninterrupted and safe energy was provided.
The project included the installation of a 34.5/0.4 kV transformer center, medium voltage cells, distribution panels and cabling works. The system was designed for the safety and continuity of the hospital’s operations.