Investor | AK-PRES Metal |
---|---|
Project Name | Factory Electrical Infrastructure |
Location | Manisa / Turkey |
Contract Start Date | 2024 |
Work End Date | 2025 |
Project Status | Completed |
With the Factory Electrical Infrastructure project, which was started in 2024 and completed in 2025 at AK-PRES Metal's production facility in Manisa, the entire energy infrastructure of the facility was modernized.
Within the scope of the project; medium and low voltage energy distribution systems, transformer centers, energy panels, cabling infrastructure and energy monitoring systems were established. Efficiency, safety and sustainability were taken as basis in system designs. The project increased AK-PRES Metal's production efficiency while also providing a solid and sustainable infrastructure in terms of long-term energy management.