Within the scope of the medium voltage electrical infrastructure project carried out in 2021 at the Akkuyu Nuclear Power Plant site located in Mersin, the installation of the transformer substation, low voltage distribution panels, cable trays, and cabling works were successfully completed. All systems were commissioned after undergoing detailed testing and commissioning processes. This project supported the reliability and sustainability of the plant’s power transmission infrastructure.
Investor | Akkuyu Nuclear Power Plant |
---|---|
Project Name | Medium Voltage Electrical Infrastructure |
Location | Mersin / Türkiye |
Contract Start Date | 2021 |
Completion Date | 2021 |
Project Status | Completed |