Investor Altınay Teknoloji - Çelik Construction
Project Name Technology Campus Electrical Works
Location Istanbul / Türkiye
Contract Start Date 2026
Completion Date 2026
Project Status Ongoing

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Power Distribution
      • Cable Trays and Cabling
      • Power Factor Correction Panels
      • Low Voltage Distribution Panels
      • Lighting System
      • Lighting Automation
      • UPS System
      • Busbar System
      • Fire Detection System
      • Energy Monitoring System
      • Lightning Protection and Grounding System
      • Low Current Data Systems
      • Testing and Commissioning
As part of the Technology Campus Electrical Works (Grass Robot) project, the electrical and low-current infrastructure systems of the facility under construction in Istanbul are being implemented comprehensively. The project scope includes medium-voltage power distribution and transformer substation installation, low-voltage power distribution systems, cable tray and cabling works, power factor correction and distribution panels, lighting and lighting automation systems, UPS and busbar systems, fire detection systems, energy monitoring systems, lightning protection and grounding systems, as well as low-current data infrastructure. Testing and commissioning activities are being carried out in parallel with project progress, and the works continue to ensure the safe and uninterrupted operation of the facility.