Investor Altınay Technology
Project Name Factory Electrical Infrastructure
Location Kocaeli / Turkey
Contract Start Date 2023
Work End Date 2024
Project Status Done

Services Provided Within the Scope of the Project

      • Medium Voltage Energy Distribution (Transformer Center)
      • Low Voltage Energy Distribution
      • Cable Ducts and Cables
      • Compensation Panels
      • Low Voltage Distribution Panels
      • Lighting System
      • Lighting Automation
      • UPS System
      • Busbar System
      • Fire Detection System
      • Energy Monitoring System
      • Lightning Rod and Grounding System
      • Weak Current Data Systems
      • Testing and Commissioning
The Factory Electrical Infrastructure project at Altınay Teknoloji’s production facility in Kocaeli began in 2023 and was successfully completed in 2024, establishing a modern and high-standard power system. 
 The project involved the implementation of medium and low voltage distribution systems, transformer centers, energy panels, cabling infrastructure, and energy monitoring systems. These solutions enhanced the facility’s energy efficiency and ensured a reliable and sustainable operating environment. This infrastructure investment has laid a solid foundation for supporting Altınay Teknoloji’s advanced production operations.