Investor | Arçelik |
---|---|
Project Name | Transformer Substation Installation |
Location | Eskişehir / Turkey |
Contract Start Date | 2010 |
Work End Date | 2010 |
Project Status | Completed |
In 2010, a Transformer Center Installation was successfully completed at Arçelik’s Eskişehir facility, enhancing the plant’s power infrastructure for safety and efficiency.
The project included the installation of a 34.5/0.4 kV transformer center, MV switchgear, distribution panels, power cabling, and protection systems. The system was designed to ensure uninterrupted power supply to the production lines and long-term operational reliability.