Investor Arçelik
Project Name Transformer Substation Installation
Location Eskişehir / Turkey
Contract Start Date 2010
Work End Date 2010
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
In 2010, a Transformer Center Installation was successfully completed at Arçelik’s Eskişehir facility, enhancing the plant’s power infrastructure for safety and efficiency. 
 The project included the installation of a 34.5/0.4 kV transformer center, MV switchgear, distribution panels, power cabling, and protection systems. The system was designed to ensure uninterrupted power supply to the production lines and long-term operational reliability.