Investor | Assan Faurecia Exhaust Factory |
---|---|
Project Name | Factory Electrical Infrastructure |
Location | Kocaeli / Turkey |
Contract Start Date | 2019 |
Completion Date | 2019 |
Project Status | Completed |
Electrical infrastructure installation was carried out in 2019 for the Assan Faurecia Exhaust Factory located in Kocaeli, Turkey. The project included 1 unit 1250 kVA oil-type transformer, 5 Medium Voltage (MV) cells, 800 meters of MV cable, 1013 meters of busbar system, 24,100 meters of Low Voltage (LV) cable, and 18,000 meters of Weak Current (WC) cable. All production, assembly, and commissioning works were successfully completed and the project was delivered within the same year.