Investor | Assan Yapı |
---|---|
Project Name | Orhanlı Logistics Warehouse Center |
Location | Istanbul / Turkey |
Contract Start Date | 2024 |
Completion Date | 2025 |
Project Status | Ongoing |
The electrical infrastructure project initiated by Assan Yapı in 2024 at the Logistics Warehouse Center in Orhanlı, Istanbul, includes the installation of a modern and comprehensive energy distribution system. The scope covers 2 units of 1600kVA oil-immersed transformers and 5 medium voltage (MV) cells, along with 66,000 meters of low voltage (LV) cable and 1,730 meters of lighting busbar.
The project addresses uninterrupted energy needs of the logistics warehouse with solutions such as compensation panels, low voltage distribution panels, lighting systems and automation, UPS systems, and busbar systems. Additionally, fire detection, energy monitoring, lightning protection, grounding installations, and weak current data systems are being installed to ensure a secure and efficient electrical infrastructure. Testing and commissioning of all systems are planned to be completed in 2025.