Investor | Asyaport Port |
---|---|
Project Name | Port Electrical Infrastructure Installation |
Location | Tekirdağ / Turkey |
Contract Start Date | 2015 |
Completion Date | 2015 |
Project Status | Completed |
Electrical infrastructure installation was carried out in 2015 at Asyaport Port located in Tekirdağ, Turkey. The project included 2 units of 16 MVA, 1 unit of 4 MVA, 1 unit of 630 kVA, 5 units of 1600 kVA hermetic type, and 6 units of 1600 kVA dry type transformers. Additionally, 74 Medium Voltage (MV) cells, 35,000 meters of MV cable, and 117,400 meters of Low Voltage (LV) cable were used to establish the energy distribution infrastructure. All manufacturing, assembly, and commissioning processes were successfully completed and the project was delivered within the same year.