For the Babil Biogas Energy Production Facility located in Şanlıurfa, a comprehensive system was established within the scope of the energy infrastructure using 1 unit of 2000 kVA, 1 unit of 1000 kVA, and 1 unit of 250 kVA hermetic transformers, 16 medium voltage cells, 2700 meters of medium voltage cable, and production facility automation cables.

The project was designed to support sustainable energy production and was successfully commissioned.

Investor Babil Biogas Energy Production
Project Name Biogas Energy Production Facility
Location Şanlıurfa / Türkiye
Contract Start Date 2020
Completion Date 2020
Project Status Completed

Tablo

    • Medium Voltage Power Distribution (Transformer Substation)
    • Low Voltage Distribution Panels
    • Cable Ducts and Cables
    • Testing and Commissioning