Investor | Bayegan |
---|---|
Project Name | General Directorate Electrical Infrastructure |
Location | Istanbul / Turkey |
Contract Start Date | 2015 |
Work End Date | 2015 |
Project Status | Done |
In the facility of Bayegan General Directorate in Istanbul, with the General Directorate Electrical Infrastructure project, which was completed in 2015, the energy infrastructure of offices and work areas was modernized and made safe and efficient. Within the scope of the project, medium and low voltage power distribution systems, transformer center, distribution boards and cabling infrastructure were installed. The system is designed to high standards in terms of continuity and energy management.