Investor Beta Kimya
Project Name Factory Electrical Infrastructure
Location Kocaeli / Turkey
Contract Start Date 2021
Work End Date 2021
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Energy Distribution (Transformer Center)
      • Low Voltage Distribution Panels
      • Compensation Panels
      • Lighting System
      • UPS System
      • Busbar System
      • Low Voltage Energy Distribution
      • Fire Detection System
      • Energy Monitoring System
      • Lightning Rod and Grounding System
      • Weak Current Data Systems
      • Testing and Commissioning
In 2021, the Factory Electrical Infrastructure project at Beta Kimya’s production facility in Kocaeli was successfully completed, establishing a modernized power system designed for efficiency and safety. 
 The project included medium and low voltage energy distribution, transformer center installation, power panels, cabling, and integrated energy monitoring systems. All systems were designed to ensure uninterrupted production and sustainable energy management. This investment significantly strengthened Beta Kimya’s production infrastructure and modernized its technical operations.
New Projects