Investor | Beta Kimya |
---|---|
Project Name | Factory Electrical Infrastructure |
Location | Kocaeli / Turkey |
Contract Start Date | 2021 |
Work End Date | 2021 |
Project Status | Completed |
In 2021, the Factory Electrical Infrastructure project at Beta Kimya’s production facility in Kocaeli was successfully completed, establishing a modernized power system designed for efficiency and safety.
The project included medium and low voltage energy distribution, transformer center installation, power panels, cabling, and integrated energy monitoring systems. All systems were designed to ensure uninterrupted production and sustainable energy management.
This investment significantly strengthened Beta Kimya’s production infrastructure and modernized its technical operations.