Investor | Çanakkale Bridge |
---|---|
Project Name | Electrical Infrastructure |
Location | Çanakkale / Turkey |
Contract Start Date | 2018 |
Completion Date | 2018 |
Project Status | Completed |
This comprehensive project, carried out in 2018 as part of the Çanakkale Bridge's electrical infrastructure, included the installation of 9 oil-type transformers (5x1600kVA, 1x1250kVA, and 3x1000kVA) and 40 medium voltage (MV) cells. The project was designed to meet the energy needs of one of Turkey's most significant transportation projects, supported by 69,000 meters of MV cable and 40,000 meters of low voltage (LV) cable.
The scope of work covered the entire energy distribution system including compensation panels, low voltage distribution panels, and cable channels. All systems were successfully tested and commissioned, ensuring a reliable and uninterrupted power supply for the bridge and its surroundings.