Investor Çelsentaş A.Ş.
Project Name Factory Electrical Infrastructure
Location Karabük / Turkey
Contract Start Date 2020
Work End Date 2020
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Energy Distribution (Transformer Center)
      • Low Voltage Distribution Panels
      • Compensation Panels
      • Lighting System
      • UPS System
      • Busbar System
      • Low Voltage Energy Distribution
      • Fire Detection System
      • Energy Monitoring System
      • Lightning Rod and Grounding System
      • Weak Current Data Systems
      • Testing and Commissioning
In 2020, the Factory Electrical Infrastructure project at Çelsentaş A.Ş.’s production facility in Karabük was successfully completed, restructuring the plant’s power systems to ensure safety and operational efficiency. 
 The project involved the installation of medium and low voltage systems, transformer center, power panels, cabling infrastructure, and modern energy distribution components. All implementations were guided by sustainability and continuous production needs. This investment enhanced Çelsentaş A.Ş.’s technical infrastructure and enabled stable and secure energy usage in industrial production.