Investor DHL Logistics
Project Name Asia-1 Logistics Center
Location İstanbul / Türkiye
Contract Start Date 2025
Completion Date 2026
Project Status Completed.

Services Provided Within the Scope of the Project

      • Medium Voltage Energy Distribution (Transformer Center)
      • Low Voltage Energy Distribution
      • Cable Ducts and Cables
      • Compensation Panels
      • Low Voltage Distribution Panels
      • Lighting System
      • Lighting Automation
      • UPS System
      • Busbar System
      • Fire Detection System
      • Energy Monitoring System
      • Lightning Rod and Grounding System
      • Weak Current Data Systems
      • Testing and Commissioning
We have successfully completed the electrical infrastructure works of DHL’s Asia-1 Logistics Center, located on the Anatolian Side of Istanbul, for DHL, one of the world's largest logistics companies. Within the scope of the project, we installed the high-voltage, low-voltage, solar energy system (GES), and all other electrical infrastructure systems, delivering the facility ready for full operation.

This strategic center will not only increase DHL’s operational capacity but will also make significant contributions to the regional economy. It will create employment opportunities, accelerate logistics processes, and help reduce operational costs. At the same time, it will strengthen Türkiye’s position within the international logistics network and contribute to increasing the country’s competitiveness in global trade.