Investor Düzce University Technopark
Project Name Electrical Infrastructure Improvement
Location Düzce / Turkey
Contract Start Date 2017
Completion Date 2017
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Energy Distribution (Transformer Center)
      • Low Voltage Energy Distribution
      • Cable Ducts and Cables
      • Compensation Panels
      • Low Voltage Distribution Panels
      • Testing and Commissioning
The electrical infrastructure improvement works for Düzce University Technopark located in Düzce were completed in 2017. Within the project scope, medium voltage and low voltage electrical works were carried out for the new facility. Medium voltage power distribution (transformer center installation), low voltage power distribution, cable trays and cabling, compensation panels and low voltage distribution panel installations were completed. All systems were tested and commissioned.