Investor Galataport İstanbul
Project Name Transformer Substation Installation
Location Istanbul / Turkey
Contract Start Date 2020
Completion Date 2020
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
Within the scope of the Galataport İstanbul project, the “Transformer Substation Installation” was completed in Istanbul in 2020. Extensive electrical works were carried out for the relocation of the permanent transformer substation. Medium voltage power distribution, low voltage panel installations, cable trays and cabling were successfully completed, followed by system testing and commissioning. The project was successfully delivered within the planned timeframe.