Investor | Galataport İstanbul |
---|---|
Project Name | Transformer Substation Installation |
Location | Istanbul / Turkey |
Contract Start Date | 2020 |
Completion Date | 2020 |
Project Status | Completed |
Within the scope of the Galataport İstanbul project, the “Transformer Substation Installation” was completed in Istanbul in 2020. Extensive electrical works were carried out for the relocation of the permanent transformer substation. Medium voltage power distribution, low voltage panel installations, cable trays and cabling were successfully completed, followed by system testing and commissioning. The project was successfully delivered within the planned timeframe.