Investor Gazisolar A.Ş.
Project Name Factory Electrical Infrastructure
Location Tekirdağ / Turkey
Contract Start Date 2013
Work End Date 2013
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Energy Distribution (Transformer Center)
      • Low Voltage Energy Distribution, Cable Ducts and Cables
      • Compensation Panels
      • Low Voltage Distribution Panels
      • Lighting System
      • Lighting Automation
      • UPS System
      • Busbar System
      • Fire Detection System
      • Energy Monitoring System
      • Lightning Rod and Grounding System
      • Weak Current Data Systems
      • Testing and Commissioning
In 2013, the Factory Electrical Infrastructure project at Gazisolar A.Ş.’s production facility in Tekirdağ was completed, delivering a reliable and sustainable power system designed for industrial operations. 
 The scope included the installation of medium and low voltage systems, a transformer center, distribution panels, cabling infrastructure, and energy control systems. The infrastructure was designed to ensure uninterrupted power for production processes. This project supported Gazisolar’s production efficiency and laid the foundation for long-term energy management.