Investor | Gazisolar A.Ş. |
---|---|
Project Name | Factory Electrical Infrastructure |
Location | Tekirdağ / Turkey |
Contract Start Date | 2013 |
Work End Date | 2013 |
Project Status | Completed |
In 2013, the Factory Electrical Infrastructure project at Gazisolar A.Ş.’s production facility in Tekirdağ was completed, delivering a reliable and sustainable power system designed for industrial operations.
The scope included the installation of medium and low voltage systems, a transformer center, distribution panels, cabling infrastructure, and energy control systems. The infrastructure was designed to ensure uninterrupted power for production processes.
This project supported Gazisolar’s production efficiency and laid the foundation for long-term energy management.