Investor | Gökbora International Transport |
---|---|
Project Name | Transformer Substation Installation |
Location | Istanbul / Turkey |
Contract Start Date | 2008 |
Completion Date | 2008 |
Project Status | Completed |
The “Transformer Substation Installation” project, completed in 2008 in Istanbul for Gökbora International Transport, was developed to meet the energy requirements of the company’s logistics operations. The project involved the installation of a transformer substation connected to the medium voltage distribution system, as well as low voltage distribution panels and cable trays.
All electrical infrastructure testing and commissioning processes were carried out by professional teams to ensure reliable and uninterrupted energy supply for the transportation sector. As a result, Gökbora's Istanbul facilities were equipped with a dependable electrical infrastructure.