Investor Güzeller OSB Vocational High School
Project Name Electrical Infrastructure
Location Kocaeli / Turkey
Contract Start Date 2018
Completion Date 2018
Project Status Completed

Services Provided Within the Scope of the Project

      • Low Voltage Power Distribution
      • Cable Ducts and Cables
      • Compensation Panels
      • Low Voltage Distribution Panels
      • Lighting System
      • Fire Detection System
      • Lightning Rod and Grounding System
      • Low Current Data Systems
      • Testing and Commissioning
The electrical infrastructure installation was carried out in 2018 for Güzeller OSB Vocational High School located in Kocaeli with 21,000 m² indoor space. Within the project scope; low voltage power distribution, cable trays and cabling, compensation panels, low voltage distribution panels, lighting system, fire detection system, lightning rod and grounding system, and low current data systems were installed. All systems were tested and commissioned.