Investor Kolin Construction
Project Name Defense Industry Campus Electrical Infrastructure
Location Kırıkkale / Turkey
Contract Start Date 2023
Work End Date 2023
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Energy Distribution (Transformer Center)
      • Low Voltage Energy Distribution
      • Cable Ducts and Cables
      • Compensation Panels
      • Low Voltage Distribution Panels
      • Lighting System
      • Lighting Automation
      • UPS System
      • Busbar System
      • Fire Detection System
      • Energy Monitoring System
      • Lightning Rod and Grounding System
      • Weak Current Data Systems
      • Testing and Commissioning
With the project of Defense Industry Şəharciyi Electric İnfrastruktur, which was completed by Kolin İnşaat in Kırıkkale in 2023, the energy infrastructure of the region has been modernized and remains safe and productive. was introduced.
Within the framework of the plan, medium and low voltage energy sharing systems, transformer centers, sharer panels and cable infrastructure were established. It has been taken into consideration to meet the uninterrupted and risk-free energy needs of the system defense industry objects.
New Projects