Investor Kuveyt Türk A.Ş.
Project Name Transformer Center Installation
Location Istanbul / Turkey
Contract Start Date 2014
Completion Date 2014
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
The "Transformer Center Installation" project completed in 2014 at Kuveyt Türk A.Ş.'s headquarters campus in Istanbul was implemented to provide secure and sustainable power distribution. Within the project scope, a transformer center infrastructure was created using 25 medium voltage (MV) cells and a total of 4,900 meters of MV cable.

The services provided included medium voltage power distribution (transformer center installation), commissioning of low voltage distribution panels, cable trays and cabling works. All systems were successfully completed after undergoing detailed testing and commissioning processes. Thanks to this project, Kuveyt Türk's power infrastructure was modernized to become reliable and long-lasting.