Investor Kuzeystar Shipyard
Project Name Shipyard Electrical Infrastructure Installation
Location Yalova / Turkey
Contract Start Date 2024
Work End Date -
Project Status Continue Does

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Center)
      • Medium Voltage Pool Tower
      • Relay Installation
      • Cables and Cable Ducts
      • Low Voltage Distribution Panels
      • Compensation Panel Testing and Commissioning
The Shipyard Electrical Infrastructure Installation project, which was launched in 2024 at the Yalova facility of Kuzeystar Shipyard, aims to create a modern and reliable energy infrastructure and the work is ongoing.
Within the scope of the project, medium and low voltage energy distribution systems, transformer centers, distribution panels and cabling infrastructure are being established. The systems installed will ensure that the shipyard's operations continue uninterruptedly and safely.