Investor | Mardas Port |
---|---|
Project Name | Substation Installation |
Location | Istanbul / Turkey |
Contract Start Date | 2012 |
Work End Date | 2012 |
Project Status | Done |
With the Transformer Center Installation project completed in 2012 at the Mardas Port facility in Istanbul, the port's energy infrastructure was strengthened and reliable energy supply was provided.
In the project, the installation of a 34.5/0.4 kV transformer center, medium voltage cells, distribution boards and cabling works were carried out. The system is designed to ensure uninterrupted and safe port operations.