Investor Mardas Port
Project Name Substation Installation
Location Istanbul / Turkey
Contract Start Date 2012
Work End Date 2012
Project Status Done

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
With the Transformer Center Installation project completed in 2012 at the Mardas Port facility in Istanbul, the port's energy infrastructure was strengthened and reliable energy supply was provided.
In the project, the installation of a 34.5/0.4 kV transformer center, medium voltage cells, distribution boards and cabling works were carried out. The system is designed to ensure uninterrupted and safe port operations.