With the Transformer Center Installation project completed in 2014 at the Medipol Hospital facility in Istanbul, the hospital's energy infrastructure was strengthened, uninterrupted and safe energy was provided.
In the project, the installation of a 34.5/0.4 kV transformer center, medium voltage cells, distribution boards and cabling works were carried out. The system is designed for the safety and continuity of the hospital's operations.