| Investor | Mercedes-Benz - TSC Construction |
|---|---|
| Project Name | Building 6 Electrical Works |
| Location | Istanbul / Türkiye |
| Contract Start Date | 2026 |
| Completion Date | 2026 |
| Project Status | Ongoing |
As part of the Building 6 Electrical Works project carried out at the Mercedes-Benz Hoşdere Factory, the facility’s electrical and low-current infrastructure systems are being implemented in accordance with modern industrial requirements. The project scope includes medium-voltage power distribution and transformer substation systems, low-voltage power distribution systems, cable trays and cabling works, power factor correction and distribution panels, lighting and lighting automation systems, UPS and busbar systems, fire detection systems, energy monitoring systems, lightning protection and grounding systems, as well as low-current data infrastructure. Testing and commissioning activities are being carried out in parallel with the project schedule, and the works continue to ensure the safe, efficient, and uninterrupted operation of the facility.