Investor Mesa Bodrum Evleri
Project Name Villa, Residence, and Hotel Electrical Infrastructure
Location Muğla / Turkey
Contract Start Date 2019
Completion Date 2022
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Energy Distribution (Transformer Center)
      • Low Voltage Energy Distribution
      • Cable Ducts and Cables
      • Compensation Panels
      • Low Voltage Distribution Panels
      • Lighting System
      • Lighting Automation
      • UPS System
      • Busbar System
      • Fire Detection System
      • Energy Monitoring System
      • Lightning Rod and Grounding System
      • Weak Current Data Systems
      • Testing and Commissioning
The "Villa, Residence, and Hotel Electrical Infrastructure" project carried out between 2019 and 2022 in Muğla for Mesa Bodrum Evleri includes the complete electrical infrastructure for 250 villas/residences and a 50-room hotel within the Demirbükü Residences. The project involved the installation of a transformer center, low voltage power distribution, cable channels, and cabling works, as well as compensation panels, low voltage distribution panels, lighting system, and automation.

As modern energy solutions, UPS system, busbar system, fire detection system, energy monitoring system, and lightning rod and grounding installations were integrated. The project was also supported by weak current data systems to ensure all buildings have a safe and efficient electrical infrastructure. All testing and commissioning processes were successfully completed.
New Projects