Investor | Mutlu Akü |
---|---|
Project Name | Transformer Center Installation |
Location | Istanbul / Turkey |
Contract Start Date | 2022 |
Work End Date | 2022 |
Project Status | Completed |
With the Transformer Center Installation project, which was successfully completed in 2022 at Mutlu Battery's production facility in Istanbul, the energy infrastructure of the factory was strengthened and a highly secure and efficient energy distribution system was implemented.
Within the scope of the project; a transformer center at the 34.5/0.4 kV level was established, medium voltage cells, distribution panels, protection systems and cabling works were carried out. The system was designed to ensure both production continuity and high security against possible energy outages.
This investment has become a strategic infrastructure solution that supports Mutlu Battery's production capacity.