Investor | Netlog Logistics |
---|---|
Project Name | Factory Electrical Infrastructure |
Location | Istanbul - Muğla - Balıkesir / Turkey |
Contract Start Date | 2014 |
Completion Date | 2014 |
Project Status | Completed |
The “Factory Electrical Infrastructure” project for Netlog Logistics, completed in 2014 across Istanbul, Muğla, and Balıkesir, involved the installation of a comprehensive electrical and systems infrastructure for logistics facilities. The project included a 1000kVA hermetic transformer, 4 medium voltage (MV) cells, and 890 meters of MV cable for the energy distribution system.
A total of 39,300 meters of low voltage (LV) cable (27,300m + 12,000m) and 24,500 meters of weak current cable (9,500m + 15,000m) were laid to support lighting, security, fire detection, and data systems. The project also included the installation of compensation panels, LV distribution panels, UPS systems, and busbar systems.
Additionally, lighting automation, fire detection systems, energy monitoring systems, lightning protection, grounding systems, and comprehensive weak current data systems were installed. All systems were successfully tested and commissioned, delivering a modern and secure electrical infrastructure for the logistics facilities.