Investor Nexans
Project Name Factory Electrical Infrastructure
Location Istanbul / Turkey
Contract Start Date 2007
Work End Date 2007
Project Status Completed

Services Provided Within the Scope of the Project

The energy system was modernized and production efficiency was increased with the Factory Electrical Infrastructure project completed in 2007 at Nexans' Istanbul facility. 
The project included medium and low voltage energy distribution, transformer center installation, energy panels and cabling infrastructure. The system was designed to provide uninterrupted and safe energy.