Investor Okan University
Project Name Transformer Center Installation
Location Istanbul / Turkey
Contract Start Date 2006
Completion Date 2006
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
For Okan University Tepeören Campus in Istanbul, a 34.5/0.4kV 2x1600 kVA transformer facility was installed in 2006. Within the project scope, medium voltage power distribution (transformer center installation), mounting of low voltage distribution panels, cable trays and cabling works were completed. All systems were tested and commissioned.