The "Transformer Center Installation" project carried out for Öztürk Biogas in Kahramanmaraş in 2016 aimed to strengthen and optimize the power distribution infrastructure. Within the project scope, 4x1600kVA and 1x400kVA oil-immersed transformers, 16 medium voltage (MV) cells, 3000 meters of low voltage (LV) cable and 840 meters of medium voltage (MV) cable were installed.

Additionally, compensation panels, low voltage distribution panels, cable trays, and testing/commissioning procedures were among the complementary services of the project. These works modernized the facility's power distribution system, providing a reliable and uninterrupted electrical infrastructure.

Investor Öztürk Biogas
Project Name Transformer Center Installation
Location Kahramanmaraş / Turkey
Contract Start Date 2016
Completion Date 2016
Project Status Completed

Tablo

    • Medium Voltage Energy Distribution (Transformer Center)
    • Low Voltage Energy Distribution
    • Cable Ducts and Cables
    • Compensation Panels
    • Low Voltage Distribution Panels
    • Testing and Commissioning