Investor Park Cam
Project Name FUR-40 New Furnace Factory Electrical Infrastructure
Location Bilecik / Turkey
Contract Start Date 2023
Work End Date 2025
Project Status Continue Does

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Center)
      • Lighting System
      • Low Voltage Power Distribution
      • Low Voltage Distribution Panels
      • UPS System
      • Busbar System
      • Energy Monitoring System
      • Emergency Announcement System
      • Cable Ducts and Cables
      • Lightning Rod and Grounding System
      • Fire Stop System
      • Testing and Commissioning
The FUR-40 New Furnace Factory Electrical Infrastructure project, carried out by Park Cam in Bilecik, was initiated in 2023 and successfully completed in 2025. The project involved the installation of all necessary power infrastructure for the new production line, in line with modern standards. 
The scope included medium and low voltage distribution systems, transformer centers, main distribution panels, cable routing, energy monitoring systems, and busbar installations. The system was designed with consideration for the high-energy demands and safety requirements of high-temperature furnace operations. This project served as a key infrastructure investment supporting Park Cam’s increased glass production capacity and modernization goals.
New Projects