Investor Polisan
Project Name Transformer Center Installation
Location Kocaeli / Turkey
Contract Start Date 2017
Work End Date 2017
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
With the Transformer Center Installation project completed in 2017 at Polisan’s Kocaeli facility, a safe and efficient energy infrastructure suitable for industrial activities was established. 
Within the scope of the project; 34.5/0.4 kV transformer center was established, medium voltage cells, distribution panels and all related cabling works were carried out. The system was designed to ensure uninterrupted production and long-term operational security. This investment strengthened Polisan’s energy infrastructure and stabilized production processes.