Investor RB Square
Project Name Factory Electrical Infrastructure
Location Balıkesir / Turkey
Contract Start Date 2023
Work End Date 2024
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Center)
      • Lighting System
      • Low Voltage Power Distribution
      • Low Voltage Distribution Panels
      • UPS System
      • Busbar System
      • Energy Monitoring System
      • Emergency Announcement System
      • Cable Ducts and Cables
      • Lightning Rod and Grounding System
      • Fire Stop System
      • Testing and Commissioning
The Factory Electrical Infrastructure project at RB Karesi’s production facility in Balıkesir began in 2023 and was completed in 2024, establishing a modern and robust power infrastructure to support production processes. 
 The scope included medium and low voltage power distribution systems, transformer centers, energy panels, cabling infrastructure, and energy monitoring solutions—all successfully implemented on-site. The systems were designed to enhance energy efficiency and operational safety. This project significantly strengthened RB Karesi’s technological infrastructure by ensuring a sustainable and uninterrupted power supply for its growing production capacity.