Within the scope of the "Transformer Center Installation" project carried out in 2012 in Samsun for Samsun Avdan Energy Production, a total of 10 hermetic transformers (7x1600kVA, 1x400kVA, 1x160kVA, and 1x100kVA capacity) and 21 medium voltage cells were installed. The project also integrated a comprehensive high current system, automation infrastructure, and SCADA system. The works covering the entire energy distribution system included low voltage distribution panels, cable channels, and cabling. All systems successfully passed testing and commissioning processes, ensuring the facility obtained a modern and reliable energy distribution infrastructure.
Investor | Samsun Avdan Energy Production |
---|---|
Project Name | Transformer Center Installation |
Location | Samsun / Turkey |
Contract Start Date | 2012 |
Completion Date | 2012 |
Project Status | Completed |