| Investor | Sefine Shipyard |
|---|---|
| Project Name | Transformer Center Installation |
| Location | Yalova / Turkey |
| Contract Start Date | 2018 |
| Work End Date | 2018 |
| Project Status | Completed |
The Transformer Center Installation project at Sefine Shipyard in Yalova was completed in 2018, strengthening the shipyard’s power infrastructure for uninterrupted and secure energy supply.
The project included the installation of a 34.5/0.4 kV transformer center, medium voltage switchgear, distribution panels, and cabling works. The system is designed to ensure continuous and safe shipyard operations.