Investor Sefine Shipyard
Project Name Transformer Center Installation
Location Yalova / Turkey
Contract Start Date 2018
Work End Date 2018
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
The Transformer Center Installation project at Sefine Shipyard in Yalova was completed in 2018, strengthening the shipyard’s power infrastructure for uninterrupted and secure energy supply.
The project included the installation of a 34.5/0.4 kV transformer center, medium voltage switchgear, distribution panels, and cabling works. The system is designed to ensure continuous and safe shipyard operations.