As part of the Çanakkale Ground-Mounted Solar Power Plant (SPP) project developed by SPI Energy, the facility's electrical power infrastructure was completed on a turnkey basis. The project included medium-voltage power distribution, distribution and transformer substation installation, low-voltage power distribution systems, cable trays and cabling works, power factor correction and low-voltage distribution panels, as well as the installation of an energy monitoring system. Following the successful completion of testing and commissioning activities, the power plant was put into operation to ensure safe, efficient, and uninterrupted energy generation.
| Investor | SPI Energy |
|---|---|
| Project Name | Çanakkale Ground-Mounted Solar Power Plant Works |
| Location | Çanakkale / Türkiye |
| Contract Start Date | 2025 |
| Completion Date | 2025 |
| Project Status | Completed |