Investor Taisei Corporation (Marmaray Project)
Project Name Transformer Station Installation
Location Istanbul / Turkey
Contract Start Date 2005
Completion Date 2005
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
Within the scope of the Marmaray Project managed by Taisei Corporation, the "Transformer Station Installation" project completed in Istanbul in 2005 involved the setup of a transformer facility with a capacity of 630 kVA at 34.5/0.4kV voltage level. The project was implemented to ensure reliable and uninterrupted operation of Marmaray's power infrastructure.

The scope included medium voltage energy distribution systems, low voltage distribution panels, cable channels, and cabling works. All systems were successfully tested and commissioned. This project stands out as a critical infrastructure investment to meet Marmaray's electrical power requirements.