Investor | Thy Doco |
---|---|
Project Name | Transformer Substation Installation |
Location | Istanbul / Turkey |
Contract Start Date | 2014 |
Work End Date | 2014 |
Project Status | Completed |
In 2014, the Transformer Center Installation project at THY DO&CO’s Istanbul facility was successfully completed, reinforcing the site’s energy infrastructure to ensure uninterrupted and secure power supply.
The project included the installation of a 34.5/0.4 kV transformer center, medium voltage switchgear, distribution panels, power cabling, and protection systems. The system was designed to reliably support the high energy demand of continuous operations.
This investment provided THY DO&CO with enhanced energy reliability and operational continuity.