Investor Thy Doco
Project Name Transformer Substation Installation
Location Istanbul / Turkey
Contract Start Date 2014
Work End Date 2014
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
In 2014, the Transformer Center Installation project at THY DO&CO’s Istanbul facility was successfully completed, reinforcing the site’s energy infrastructure to ensure uninterrupted and secure power supply. 

The project included the installation of a 34.5/0.4 kV transformer center, medium voltage switchgear, distribution panels, power cabling, and protection systems. The system was designed to reliably support the high energy demand of continuous operations. This investment provided THY DO&CO with enhanced energy reliability and operational continuity.