Investor Türk Ytong
Project Name Factory Electrical Infrastructure
Location Kocaeli / Turkey
Contract Start Date 2018
Work End Date 2018
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Energy Distribution (Transformer Center)
      • Low Voltage Energy Distribution,
      • Cable Ducts and Cables
      • Compensation Panels
      • Low Voltage Distribution Panels
      • Lighting System
      • Lighting Automation
      • UPS System
      • Busbar System
      • Fire Detection System
      • Energy Monitoring System
      • Lightning Rod and Grounding System
      • Weak Current Data Systems
      • Testing and Commissioning
With the Factory Electrical Infrastructure project, which was successfully completed in 2018 at Türk Ytong's production facility in Kocaeli, the factory's energy systems were modernized and a safe, efficient and sustainable infrastructure was created. 
Within the scope of the project; medium and low voltage energy systems were established, transformer center, distribution panels, cabling infrastructure and energy management solutions were integrated into the field. The system was designed to ensure production continuity and increase operational safety. This project strengthened Türk Ytong's industrial infrastructure and made a significant contribution to production performance.