Investor | Türk Ytong |
---|---|
Project Name | Factory Electrical Infrastructure |
Location | Kocaeli / Turkey |
Contract Start Date | 2018 |
Work End Date | 2018 |
Project Status | Completed |
With the Factory Electrical Infrastructure project, which was successfully completed in 2018 at Türk Ytong's production facility in Kocaeli, the factory's energy systems were modernized and a safe, efficient and sustainable infrastructure was created.
Within the scope of the project; medium and low voltage energy systems were established, transformer center, distribution panels, cabling infrastructure and energy management solutions were integrated into the field. The system was designed to ensure production continuity and increase operational safety. This project strengthened Türk Ytong's industrial infrastructure and made a significant contribution to production performance.