Investor Turkcell Data Center
Project Name Transformer Center Installation
Location Kocaeli / Turkey
Contract Start Date 2015
Completion Date 2015
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
The "Transformer Center Installation" project completed in Kocaeli in 2015 for Turkcell Data Center aimed to support the continuous and secure operation of the data center with high-capacity power infrastructure. In the project, a comprehensive power distribution system was established using 4 units of 2500 kVA and 1 unit of 1000 kVA dry-type transformers, totaling 39 medium voltage (MV) cells and 37,000 meters of MV cable.

Within the scope of the project, medium voltage power distribution and transformer center installation, mounting of low voltage distribution panels, cable trays and cabling works were successfully completed. All systems were commissioned after undergoing detailed testing and commissioning processes. Thanks to this robust infrastructure, the data center's power needs are met uninterruptedly and securely.