Investor Türk Ytong
Project Name Transformer Substation Installation
Location Kocaeli / Turkey
Contract Start Date 1997
Work End Date 1997
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
In 1997, the Transformer Center Installation project was completed at Türk Ytong’s Kocaeli facility, enhancing the factory’s power infrastructure to provide reliable and uninterrupted energy.
The project included the installation of a 34.5/0.4 kV transformer center, medium voltage switchgear, distribution panels, and cabling. The system was designed to support continuous production and operational safety.