Investor Vestel Elektronik
Project Name Mobility Factory Additive Manufacturing Facility
Location Manisa / Turkey
Contract Start Date 2024
Work End Date -
Project Status Continuing

Services Provided Within the Scope of the Project

      • Medium Voltage Energy Distribution (Transformer Center)
      • Low Voltage Distribution Panels
      • Compensation Panels
      • Lighting System
      • Lighting Automation
      • UPS System
      • Busbar System
      • Low Voltage Energy Distribution
      • Fire Detection System
      • Energy Monitoring System
      • Lightning Rod and Grounding System
      • Weak Current Data Systems
      • Testing and Commissioning
The Mobility Factory Additional Production Facility project, launched in 2024 at Vestel Elektronik's production campus in Manisa, is being implemented in order to increase the company's capacity in the field of mobility solutions. Project work is still ongoing.
Within the scope of the energy infrastructure of the new production area; medium and low voltage power distribution systems, transformer centers, power panels, cabling infrastructure and automation-supported energy management systems are being built. All systems used in the project are designed in accordance with high efficiency and sustainability criteria. This project not only increases Vestel's production capacity for the mobility sector, but also presents a modern and environmentally friendly infrastructure approach.
New Projects