Investor Yücel Boru
Project Name Transformer Center Installation
Location Kocaeli / Turkey
Contract Start Date 1996
Work End Date 1996
Project Status Completed

Services Provided Within the Scope of the Project

      • Medium Voltage Power Distribution (Transformer Substation)
      • Low Voltage Distribution Panels
      • Cable Ducts and Cables
      • Testing and Commissioning
The Transformer Center Installation project at Yücel Boru’s Kocaeli facility was completed in 1996, strengthening the power infrastructure and ensuring reliable energy supply.
The project included the installation of a 34.5/0.4 kV transformer center, medium voltage switchgear, distribution panels, and cabling works. The system was designed to prevent production interruptions and enhance operational safety.