| Investor | Yücel Boru |
|---|---|
| Project Name | Transformer Center Installation |
| Location | Kocaeli / Turkey |
| Contract Start Date | 1996 |
| Work End Date | 1996 |
| Project Status | Completed |
The Transformer Center Installation project at Yücel Boru’s Kocaeli facility was completed in 1996, strengthening the power infrastructure and ensuring reliable energy supply.
The project included the installation of a 34.5/0.4 kV transformer center, medium voltage switchgear, distribution panels, and cabling works. The system was designed to prevent production interruptions and enhance operational safety.